3L Njumbi–Lavington
The
project
A residential renovation on Njumbi Lane, Njumbi Road off Chalbi Drive in Lavington, Nairobi. Built in 1986 and in use for some thirty-five years, the original house was a simple structure under a pitched gable roof of clay tiles. The renovation rebuilt it as a maisonette with a unique architectural style and design.
HOUSE NO. 3L
Njumbi Lane, Njumbi Road off Chalbi Drive, Lavington, Nairobi
Consultant: Arch. Joash Mrowa Wagogo
Gallery
9 frames · select a frame to view it full size
History
The house was constructed in 1986 and served as a residential building for roughly thirty-five years. The original structure was a simple building under a pitched gable roof finished with clay roofing tiles.
The existing home housed a lounge, a dining area and a kitchen, a guest bedroom, a master bedroom and two other bedrooms.
The brief
The client’s choice of construction was a maisonette. There was no preferred architectural style — the choice was for a unique style and design.
Design inspiration
The general inspiration for the concept was coming up with a unique design and having naturally lit interior spaces.
“The layout for the Lavington design was pretty rectilinear and hence posed a serious challenge doing an impressive roof. The inspiring house gave me an idea of how to go about this, and that inspired the two pyramids on the roof — which was a total gamechanger.”
Site location
Njumbi Lane, Njumbi Road off Chalbi Drive, Lavington, Nairobi.
Neighbourhood
The neighbourhood, whose buildings carry outstandingly highly inclined roofs, inspired the design of the roof. Material finishes found within the context were carried into the house — clay tiles for the roofing, plaster and paint for the exterior and interior walls and ceilings, and bush-hammered stone for the walling.
Project information
- Project
- 3L Njumbi–Lavington
- Project type
- Residential renovation
- Location
- Njumbi Lane, Njumbi Road off Chalbi Drive, Lavington-Nairobi
- House No.
- 3L
- Plot
- LR No. 3734/1101
- Original construction
- 1986
- Construction period
- 8 months
- Consultant
- Arch. Joash Mrowa Wagogo
- Water storage
- 10,000 litres